Survey first, licensed removal under containment, then clearance air testing before anyone goes back in. The documentation is what your permit, your insurer and your building inspector will ask for.
Why It Comes First
Anything built before 1990 can hold asbestos in flooring, pipe wrap, texture coat, roof felt and board. Some jurisdictions require the inspection before a demolition permit is issued at all, and the rest have their own version of the same rule.
Pricing a demolition without knowing is not a discount, it is a variation waiting to happen, usually at the worst moment. We book the survey first, quote the removal as its own line, and only then price the takedown. Removal happens under containment with negative air, and the job is not finished until clearance air testing passes and the paperwork is issued.
Lead paint follows the same discipline under lead paint removal, water-damaged buildings usually need mould remediation in the same visit, and only then does strip out work begin.
How It Runs
A qualified surveyor samples and reports before pricing.
Regulator notified where required, containment designed.
Negative air, trained crews, waste manifested.
Air testing passed, documentation issued to you.
The Work
Grouped by what the job actually is rather than by the part being fitted.
Licensed removal under containment and negative air.
Learn moreControlled removal with clearance verification.
Learn moreSource dried, material removed, air tested.
Learn moreSoft strip once the abatement clears.
Learn moreTakedown after the survey settles the scope.
Learn moreWhat your municipality wants before it issues.
Learn moreStraight Answers
From The Blog
Written for the research stage.
Next Step
Send the address and a few photos. We will tell you what survey and permit the job needs before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized