Garages And Carports
Detached garages, carports and attached bays. Most are a one-day job once the permit is in, and the only real decision is whether the concrete pad goes with it or stays for the next structure.
The Pad Decision
A sound garage pad in the right position is worth keeping. It saves the breaking, the haulage and the backfill, which on a standard double garage is a meaningful part of the price. But a cracked pad, or one in the wrong footprint for the replacement, becomes an expensive obstacle for whoever builds next.
We check level, thickness and condition during the site visit and tell you which it is, rather than defaulting to whichever is easier for us. Where it goes, it goes under slab removal and the void is filled properly.
Where the garage is attached to the house, the shared wall needs weather protection the same day, which is closer to structural demolition than to a simple takedown. Larger projects usually bundle it with the residential demolition scope.
How It Runs
Level, thickness and condition assessed on site.
Most municipalities want one even for a garage.
Doors, services and roof first, then the structure.
Material sorted and hauled, pad out or swept clean.
Attached Is Different
Removing a detached garage is a straightforward drop. Removing an attached one leaves a house wall that was never meant to be an exterior wall, and it needs weather protection before the crew leaves site. That means the sequence is planned around closing up, not just taking down, and it usually involves your builder on the same day.
Roof lines, flashing and the point where the garage slab met the house all need attention. We coordinate that rather than leaving you with an open elevation over a weekend. The structural side follows the same discipline as load bearing wall removal, any pre-1990 materials are settled under asbestos removal first, and where the driveway goes too it is quoted with the driveway removal line.
Related Work
Whole-home takedown to slab or grade.
Learn moreTimber structures cleared with the garage.
Learn morePad broken out and hauled or crushed.
Learn moreApproach and apron taken out at the same time.
Learn moreLoaded, weighed and tipped with tickets.
Learn moreWhat your municipality needs first.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and a few photos. We will tell you what survey and permit the job needs before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized