Drives And Hardstanding
Concrete, tarmac, block paving and hardstanding lifted and taken away. The sub-base underneath is assessed rather than ignored, because whether it can stay decides a large part of what the new drive costs.
The Sub-Base
Under most drives is a compacted stone layer, and its condition is the single biggest variable in what replacing the drive will cost. A sound sub-base can often stay, be regraded and be built on, which saves both the muckaway and the imported stone.
A contaminated or waterlogged one has to come out, and pretending otherwise means the new drive settles within a couple of winters and everyone blames the surfacing. We dig an inspection hole at survey and tell you which you have, in writing, so the quote for the new drive is built on a fact rather than an assumption.
Removal of the surface runs here, deeper excavation under excavation, levelling under grading and backfill, and the concrete is processed under concrete crushing where volume allows.
How It Runs
Surface type, depth and sub-base condition.
Kerb, footway and services protected.
Concrete, tarmac or blocks taken up.
Sub-base assessed, level and ready.
The Kerb Line
The drive is yours; the crossing between it and the road usually is not. Altering a dropped kerb, widening an access or working over the footway generally needs council permission and sometimes a licensed contractor for the kerb itself, and it is the part of a driveway job most often discovered late.
It also affects the removal, because a machine tracking across a footway without protection can leave you with a repair bill from the highway authority. We flag it at survey, protect the footway with mats and tell you plainly if what you are planning needs an application before it can happen.
Site access and haulage run under debris hauling, clearance of the wider plot under site clearing, and the scope sits inside concrete removal.
Related Work
Garage and shed bases too.
Learn moreOld drive crushed for reuse.
Learn moreDigging out a failed sub-base.
Learn moreLevels set for the new surface.
Learn moreWider plot cleared at the same time.
Learn moreWeighed off and taken away.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and rough dimensions. We will tell you what the scope really is before we price it.