Structures that are unsafe after fire, collapse, impact or storm damage. The priority is securing the area and removing the immediate danger, with the rest of the demolition planned once nothing is about to fall.
Make Safe First
In an emergency the first job is not demolition, it is making sure nothing else falls on anybody. That means establishing an exclusion zone that accounts for how far debris travels rather than where the building currently ends, getting people and vehicles out of it, and identifying what is holding up what before anyone approaches.
Damaged structures behave unpredictably: fire weakens steel without changing how it looks, and a partially collapsed building can be holding itself in balance in a way that a single removed element ends. So the sequence is worked out from a distance first.
Temporary support goes in under shoring and support where a structure can be stabilised rather than removed, controlled removal follows under structural demolition, and debris is cleared under debris hauling.
How It Runs
Exclusion zone set from debris reach.
What is holding what, judged at distance.
Support where possible, remove where not.
Site made safe, record kept for insurers.
Insurance
Emergency work happens before anybody has time to think about a claim, and the evidence needed later is destroyed by the work itself. Photographs before and during, a written record of what was removed and why it could not be retained, and the reasoning behind the decisions all matter to an insurer who was not there.
Where any part of the structure can be safely retained, the decision to keep it should be recorded too, because demolishing more than necessary is one of the things a loss adjuster will question afterwards. We photograph as we go and give you the record, and we say plainly when something could be saved rather than taking the faster route.
Asbestos disturbed by the incident is handled under asbestos removal, and permanent works follow under commercial demolition or residential demolition once the emergency is over.
Related Work
Stabilising rather than removing.
Learn moreControlled removal of the unsafe part.
Learn moreSite cleared once made safe.
Learn moreWhere the incident disturbed it.
Learn moreFull removal once assessed.
Learn morePlot cleared afterwards.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
If a structure is unsafe, call rather than send a message. Tell us the address and what has happened and we will tell you what to do before we arrive.