Slabs And Floors
Floor slabs, machine bases, garage and shed bases broken out to the depth you need. Reinforcement is separated for recycling and the concrete is crushed on site where there is room, rather than paid for twice.
Paying Twice
Concrete is priced by weight going out and fill is priced by weight coming in, so a slab that leaves the site as waste and comes back as imported stone has been paid for at both ends. Crushed on site it becomes granular fill that can be reused under the new build, and on any reasonable area the saving is larger than the cost of bringing a crusher in. It needs room to work and a neighbour situation that will tolerate a day or two of noise, so it is not always the answer, but it should be a decision rather than an assumption.
We tell you at survey whether the volume justifies it. Crushing itself runs under concrete crushing, anything that does leave goes under disposal and recycling, and the ground is finished under grading and backfill.
How It Runs
Thickness, reinforcement and what runs beneath.
Services and tendons located, not assumed.
Slab broken out, steel pulled and stockpiled.
Crushed for reuse or weighed off site.
Post-Tension
Some slabs are held in compression by steel tendons under very high tension, and cutting one without releasing it first is genuinely dangerous rather than merely awkward. They are common in car parks, podium decks and some commercial floors, and they are not always recorded on the drawings that reach the contractor.
The tell is often a marked edge detail or a stressing pocket, but the only safe method is to scan and to treat any unknown slab as suspect until proved otherwise. We scan before cutting, and where tendons are present the release is designed rather than improvised.
Ordinary reinforced slabs are straightforward by comparison. Controlled cuts are made under core drilling and sawing, footings under foundation breaking, and the wider scope sits under concrete removal.
Related Work
Crushed on site for reuse as fill.
Learn moreFootings and bases broken out.
Learn moreControlled cuts and penetrations.
Learn moreDrives and hardstanding lifted.
Learn moreGround levelled after the slab.
Learn moreWeighed out with a breakdown.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and rough dimensions. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized