Detached houses, garages, decks, pools and foundations across West Hartford. The survey and permit come first, the utility disconnections are started on day one, and the lot is handed back graded.
How We Work
A detached house takes two to four days of machine work. Getting to that point takes three to six weeks, and almost all of it is the utility disconnections and the permit rather than anything a crew does.
Removing a gas meter and capping the supply is commonly a matter of weeks, and it has to be requested by the owner. Homeowners who call us first and the utilities later lose that time twice over.
So the first thing we do is tell you which calls to make, in what order, before anything is booked. The work itself runs under house demolition, outbuildings under garage demolition, and the sequence under demolition permits.
How It Runs
What is there, in writing, before a price.
Permit filed, notification period started.
Abatement first, then the demolition.
Site swept, waste weighed and documented.
Local Detail
A cleared lot is not automatically a buildable one, and the difference is worth agreeing before the machine arrives. Foundations can be taken to a depth that suits a garden or a depth that suits a new foundation, and the void can be backfilled with imported stone or with the old concrete crushed on site.
Those choices change both the price and what your builder inherits, and they are much cheaper to make now than to correct later. We put the finished level in writing. Foundations come out under foundation removal, material is processed under concrete crushing, and levels are set under grading and backfill.
What We Do
Houses, garages, pools, foundations.
Learn moreUnits, offices and restaurants.
Learn moreStrip-outs with the structure kept.
Learn moreSlabs, drives and foundations.
Learn moreClearing, excavation and haulage.
Learn moreAsbestos, lead paint and mould.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and what needs to come down. We will tell you what has to be surveyed and filed before we put a number on it.