Process And Production
Production lines, tanks, vessels and services taken out of use safely. Isolation and decontamination come first, recoverable assets are catalogued before they are cut, and the building is handed back in a known state.
Order Of Work
Decommissioning is a sequence problem, not a demolition one. Every line has to be traced, isolated, drained, purged and proved dead before a cutting disc goes anywhere near it, and the order that happens in is the difference between a shutdown and an incident.
Residues are the part that catches people out: a vessel that has been empty for a year is not the same as a vessel that has been cleaned and certified, and only one of those can be cut. We work from your process drawings where they exist and survey where they do not, then issue a written isolation register that says what was proved dead, by whom and when.
Tanks come out under industrial demolition, contaminated material is handled under abatement, and the structure follows under structural demolition.
How It Runs
Services traced, isolated, drained and proved dead.
Residues cleaned and certified before cutting.
Saleable equipment catalogued and removed whole.
Structure and services out, building left clean.
Asset Recovery
Equipment that still has a resale market is worth far more lifted out intact than cut up for scrap, and the decision has to be made before the cutting starts because it cannot be made afterwards. Motors, pumps, compressors, tanks, switchgear and packaged units often have a second-hand buyer; the same items as scrap are worth a fraction of that.
The catch is that removing them whole is slower and needs access planned around them, so it only pays if it is planned into the sequence rather than discovered halfway through. We catalogue what is worth recovering at survey, tell you what the market for it looks like, and let you decide.
What is not recovered is separated for disposal and recycling, structural steel is weighed under structural steel removal, and foundations follow under foundation breaking.
Related Work
Frames, gantries and platforms recovered.
Learn moreThe building once the plant is out.
Learn moreAsbestos, lead and contamination cleared.
Learn moreMachine bases and plinths broken out.
Learn moreSegregated, weighed and documented.
Learn moreYard cleared once the plant is gone.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any drawings or survey you already hold. We will tell you what the scope really is before we price it.