Ceilings And Voids
Suspended grids and tiles, plasterboard ceilings, soffits and bulkheads taken down. What is running through the void gets traced and made safe before the first panel comes out.
The Void
A ceiling void is where a building hides everything it does not want seen, and rarely only your share of it. Sprinkler pipework, fire detection, data, ducting, lighting circuits and drainage from the floor above all run through it, and in a multi-tenant building a good proportion belongs to neighbours who will notice immediately if it stops.
Fire detection is the one that causes trouble most often, because dropping a grid without isolating the system means an alarm and an evacuation that is remembered longer than the job. We survey the void, agree isolations in writing with the building manager, and sequence around what must stay live.
Anything that has to move is priced visibly. Panels and grid leave under disposal and recycling, and the surrounding work runs as strip-out within interior demolition.
How It Runs
Services traced, ownership established.
Detection and sprinklers isolated in writing.
Tiles, grid and bulkheads down in sections.
Metal grid, tile and board separated out.
Old Panels
Ceiling tiles and the board behind soffits are on the list of materials that commonly contain asbestos in buildings put up before the mid nineties, along with the textured coating that so often sits on top of a plasterboard ceiling.
None of that is visible from a ladder. The survey settles it before the work is priced, which matters because discovering it halfway through stops the job, empties the floor and costs far more than checking would have. Where the survey is clear the ceiling comes down as ordinary work; where it is not, the panels are removed under asbestos removal with clearance certificates before anything else proceeds.
Textured coatings and old linings follow the same route through abatement, and the rest of the room is handled under wall removal.
Related Work
Ceilings as part of the whole room.
Learn morePartitions once the ceiling is down.
Learn moreGrids and bulkheads in office space.
Learn morePanels and coatings cleared safely.
Learn moreFinishes lifted after the ceiling.
Learn moreGrid metal separated and weighed.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and the lease or building rules. We will tell you what the scope really is before we price it.