Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Digging Out
Reduced level digs, foundation trenches, basements and muckaway. Underground services are located before the bucket goes in, and what comes out is classified before it is loaded rather than after.
What Comes Out
What the ground turns out to be decides a large part of the cost, and it is decided by testing rather than by looking. Clean subsoil goes one way and is cheap. Made ground, anything with hydrocarbons in it and anything from a plot with an industrial history goes somewhere else entirely and costs several times as much per tonne.
Discovering that after the lorries are booked is how a dig doubles. On any site with a past we test first, classify the material, and price the disposal on the classification rather than on hope. Where contamination is found, remediation is handled under abatement rather than quietly loaded out.
Clean arisings leave under debris hauling, and the finished levels are set under grading and backfill.
How It Runs
Line locates back and marks agreed.
Spoil classified before lorries are booked.
Excavated to the design formation.
Faces made safe, levels recorded.
Deep Digs
Unsupported excavation faces collapse without warning and are one of the most reliably fatal things on any construction site. A face that stood all morning is not evidence that it is safe; ground fails when water moves through it or when a machine tracks along the top.
Depth, soil type, groundwater and what is standing near the edge all decide what support is needed, and shoring, battering or a trench box is a design decision rather than a judgement call made in the hole. Where the dig is near a building the loading on its foundations changes as soon as the ground beside it is removed, and that needs checking before rather than after.
Temporary support is covered under shoring and support, footings under foundation breaking, and the wider scope under site work.
Related Work
Plot cleared before the dig.
Learn moreLevels formed and compacted.
Learn moreOld footings in the way of the dig.
Learn moreFaces and neighbours supported.
Learn moreMuckaway weighed and removed.
Learn moreWhere the ground is contaminated.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and what needs to move. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized