Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Floors And Suites
Partitions, ceiling grid, raised floors, cabling and finishes taken back to structure. Lift bookings, alarm isolation and the tenants above and below drive the sequence more than the demolition does.
The Cabling Problem
Twenty years of tenancies leave a ceiling void full of dead data and power cable that nobody is willing to declare abandoned. It is heavy, slow to strip, and codes in many jurisdictions now require its removal rather than leaving it in place.
That is real tonnage and real hours, and it is the item most often missing from a cheap quote. We survey the void before pricing and separate live from abandoned in writing, so the number holds. Copper recovered has scrap value and it goes back to you as a credit rather than quietly into our margin.
Grid and tile come out under ceiling and soffit, raised floor panels and screed under floor removal, and the full suite runs as an strip out where the whole floor is going.
How It Runs
Live and abandoned services separated in writing.
Lifts, docks, alarm isolation and out of hours access.
Partitions, ceilings, floors and cabling removed.
Services capped and labelled, slab and deck swept.
Living Above And Below
A floor strip in a multi-tenant tower is a noise and vibration problem before it is a demolition one. Core drilling at ten in the morning will produce complaints from two floors away, and the building manager will stop the work rather than argue with a paying tenant.
Getting this right means agreeing noisy windows in advance, monitoring where the building requires it, and moving percussive work out of hours by design rather than after a warning. It costs more per hour and far less overall than being shut down twice.
Any structural opening follows load bearing wall removal with designed shoring, cutting is done with core drilling and sawing to keep vibration low, and pre-1990 ceiling and floor materials settle under asbestos removal first.
Related Work
Cubicles, glazing and joinery stripped out.
Learn moreWhole floors back to slab and deck.
Learn moreGrid, tile and bulkheads removed.
Learn moreSelective removal between tenancies.
Learn moreLow vibration cutting in live buildings.
Learn moreGround floor units in the same building.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and the lease or board requirements. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized