Walls And Openings
Stud partitions, block walls and openings formed in existing walls. Every wall is checked for load before it is touched, and anything carrying weight gets temporary support and an engineer rather than optimism.
Load First
The only expensive mistake in wall removal is assuming a wall is not doing anything. Studwork can be carrying a floor above, a block wall can be the only thing bracing a long span, and neither announces itself from the room side.
We check from above and below, look at joist direction, and where there is any doubt an engineer looks before anything is cut. If the wall is structural that is not a problem, it is a different job: temporary support in first, a beam or lintel sized properly, and the load transferred in a controlled sequence.
That work is priced under load-bearing wall removal with shoring and support as its own line. Non-structural walls come out as part of an ordinary strip-out.
How It Runs
Joist direction, structure above and below.
Anything running in the wall traced and capped.
Cut down in sections with dust contained.
Edges squared, floor and ceiling left ready.
Inside The Wall
The wall itself is quick. What is inside it is what makes the day long. Cables, pipework, ducting, drainage and sometimes a structural post all live in walls that look like plain studwork from the room, and none of it is on a drawing in most buildings.
That is why a fixed price for wall removal without a survey is a guess dressed up as a quote. We open an inspection point where we can, check what is running through, and price the diversions as visible lines rather than absorbing them and hoping.
Where the wall predates the mid nineties, textured coating and lining board are surveyed under asbestos removal before anything is broken. Rubble leaves under debris hauling, and the wider works sit under interior demolition.
Related Work
Beams, support and a signed design.
Learn moreTemporary works before a load moves.
Learn moreWhole rooms taken back to shell.
Learn moreBulkheads and grids taken down.
Learn moreFinishes lifted after the walls.
Learn moreCoatings and boards cleared first.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and the lease or building rules. We will tell you what the scope really is before we price it.