Strip-outs, partitions, ceilings and floor finishes removed in Manchester while the rest of the building carries on. Containment, agreed hours and the structure left exactly as found.
How We Work
Working in an occupied building is a dust and noise problem before it is a demolition problem. Sealed containment, extraction that keeps the work area at negative pressure and noisy work moved to agreed hours are what stop a strip-out becoming everyone else in the building s problem.
The part most often missed is the ceiling void, which usually carries somebody else s services and almost always carries the fire detection. Isolating that in writing before the first tile comes out avoids the alarm and the evacuation.
Strip-outs run under strip-out, ceilings under ceiling and soffit, and partitions under wall removal.
How It Runs
What is there, in writing, before a price.
Permit filed, notification period started.
Abatement first, then the demolition.
Site swept, waste weighed and documented.
Local Detail
In anything built before the mid nineties the survey comes before the price rather than after it. Floor tile and the black adhesive under it, textured ceiling coatings, insulating board behind soffits and pipe lagging are all common, and none of them can be identified by looking.
Finding it halfway through stops the job and empties the floor, which costs far more than checking would have. Surveys frequently come back with much less than feared, and clearing three locations is a very different job from stripping a building.
Clearance runs under asbestos removal, floors lift under floor removal, and the scope sits under interior demolition.
What We Do
Houses, garages, pools, foundations.
Learn moreUnits, offices and restaurants.
Learn moreStrip-outs with the structure kept.
Learn moreSlabs, drives and foundations.
Learn moreClearing, excavation and haulage.
Learn moreAsbestos, lead paint and mould.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and what needs to come down. We will tell you what has to be surveyed and filed before we put a number on it.