Partitions, glazed screens, ceilings, raised access floors, joinery and the cabling behind them. Sequenced around the building s hours and the lease wording, so the floor is handed back in the condition the landlord actually asked for.
Raised Floors
An office floor plate looks simple until the access floor comes up. Underneath sit years of accumulated data cabling, power distribution, small power boxes and occasionally the remains of three previous tenancies that nobody ever removed.
Abandoned cable has to come out rather than be left, and the volume routinely surprises people who priced the job from the room rather than from under the floor. We lift a sample of panels at survey and price from what is actually there.
Pedestals and panels themselves are worth recovering where the system is a current one, because a complete raised floor has resale value that the same material as waste does not, and that is handled under deconstruction and salvage. Ceilings come down under ceiling and soffit and the rest under strip-out.
How It Runs
Make-good wording settled before pricing.
Access floor sampled, cabling volume priced.
Screens, ceilings, floors and joinery out.
Floor to the condition the lease specifies.
Make-Good
Two identical office floors can need completely different scopes depending on one paragraph in the lease. Base build with services capped at the riser is a very different job from reinstating the original partition layout, which is different again from simply removing your signage and loose furniture.
Tenants regularly price the job they imagine and are then held to the clause at inspection, and the gap between the two is found at the worst possible moment. We ask for the wording before quoting, say plainly where it is ambiguous, and put our reading of it in writing so you can settle any disagreement with the landlord while there is still time to.
Where reinstatement is required rather than removal, the structural elements run through selective demolition, waste leaves under debris hauling, and the scope sits inside tenant improvement.
Related Work
Whole office buildings taken down.
Learn moreSelective removal for the next fit-out.
Learn moreFloors taken back to base build.
Learn moreGrids, tiles and bulkheads down.
Learn moreScreed and finishes under the raised floor.
Learn moreRemoved through booked dock windows.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and the lease or building rules. We will tell you what the scope really is before we price it.