Footings And Bases
Strip footings, pad foundations, mass concrete and machine bases broken out. Depth is set by what the ground is needed for next, and anything adjoining is checked and protected before the work starts.
Depth
Foundations do not have to disappear entirely, and taking out more than the next use requires is money spent on muckaway and then again on fill. A garden or a car park needs far less than a new foundation on the same footprint.
What matters is that the answer is decided deliberately, from the design of whatever is going in next, rather than by how deep the machine happened to get before the day ended. We agree the depth in writing before starting and record what was taken out and to what level, so your engineer or builder is working from a fact.
Concrete is processed under concrete crushing where there is room, the void is filled under grading and backfill, and slabs above come out under slab removal.
How It Runs
Set by the next use, recorded in writing.
Neighbouring footings and walls assessed.
Concrete broken, reinforcement separated.
Void filled, compacted and levelled.
Next Door
Old buildings frequently share footings with the one next door, or sit close enough that breaking out on one side undermines the other. Vibration travels further through the ground than people expect, and a neighbour with a cracked render is a dispute that outlasts the job by months.
Where the work is close to a boundary we assess what is on the other side first, use a method that limits vibration, and where it is warranted carry out a condition survey with photographs before starting so there is a record of what was already there.
On party structures a formal notice may be required, and it is better raised early. Temporary support where a neighbouring structure needs it is covered under shoring and support, wider removal under structural demolition, and haulage under debris hauling.
Related Work
Floor slabs above the footings.
Learn moreBroken concrete reused as fill.
Learn moreWhere a neighbour needs holding.
Learn moreDigging out around the footings.
Learn moreVoids filled and compacted.
Learn moreResidential footings and bases.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and rough dimensions. We will tell you what the scope really is before we price it.