Partial Removal
Wings, storeys, bays and frames taken out of buildings that stay in use. The load path is worked out first, the temporary works are designed and signed, and the sequence follows the structure rather than convenience.
Load Path
Taking part of a building away changes how the rest of it stands up, and the order the work happens in is what keeps that change controlled. Removing a bay can leave a wall unrestrained. Taking a storey off can unload a frame that was relying on the weight.
Cutting a slab can remove the diaphragm that was bracing the columns. None of that is visible from the ground, so the sequence is designed from the structure rather than from what is easiest to reach with a machine. An engineer sets the order and the temporary works, and we build to it rather than around it.
The supports themselves are covered under shoring and support, steel members are recovered under structural steel removal, and anything hazardous is cleared under abatement first.
How It Runs
Load path established from what is built.
Engineer sets order and temporary works.
Props in and signed off before any cut.
New exposed face weathertight and safe.
The New Edge
Every partial demolition creates a face that was never meant to be an outside wall, and it is the part most often left out of a quote. That edge has to be made structurally sound, weathertight and safe for whatever is on the other side of it, and if the building stays occupied it has to happen as the work proceeds rather than at the end.
Exposed floor slabs need edge protection, cut services need capping and labelling, and any wall that was internal now needs to keep water out. We price the new edge as its own item so you can see it, because a quote that stops at the demolition is a quote you will be adding to later.
Openings and beams are handled under load-bearing wall removal, slabs and foundations under foundation breaking, and debris leaves under debris hauling.
Related Work
Temporary works before a load moves.
Learn moreOpenings with a signed beam design.
Learn moreFrames cut down and weighed off.
Learn moreBases and footings broken out.
Learn moreHazardous material cleared first.
Learn moreRemoved and weighed off site.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any drawings or engineer reports you hold. We will tell you what the scope really is before we price it.