Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Finishes And Screed
Ceramic and quarry tile, vinyl and sheet goods, carpet, timber, screed and the adhesive beneath. Lifted back to a substrate the next floor can actually be laid on, not just swept and handed over.
The Adhesive
Anyone can lift tile. What decides whether the next floor lasts is what is left stuck to the slab underneath, and that is where cheap quotes quietly stop. Bitumen, old flexible adhesive and screed residue all have to come off mechanically, because a new floor bonded onto old adhesive fails and the failure is blamed on the new floor rather than the preparation.
We grind back to a sound, flat substrate and tell you the tolerance we are leaving, so your flooring contractor knows what they are getting. Where the building predates the mid nineties, both the tile and the black adhesive under it are commonly asbestos-containing and are surveyed under asbestos removal before lifting starts.
Slab that is beyond preparation is handled under slab removal, and the room around it under strip-out.
How It Runs
Layers identified, adhesive sampled if needed.
Dust extraction at source, area sealed.
Tile, sheet or timber taken up in sections.
Adhesive removed, flatness checked and stated.
Silica Dust
Grinding a concrete slab produces respirable crystalline silica, which is a serious health exposure and one of the most commonly ignored risks on a fit-out site. It is also entirely controllable: extraction at the tool, H-class vacuums, sealed containment and the right masks.
A contractor who turns up to grind a floor with a broom and an open door is telling you what their other controls are like. We extract at source and seal the area, which also happens to keep the rest of your building usable while the work runs.
Waste is bagged and documented under disposal and recycling, ceilings and services come out under ceiling and soffit, and the wider scope sits under interior demolition.
Related Work
Whole rooms back to shell.
Learn moreWhen the slab itself has to go.
Learn moreTile and black adhesive cleared.
Learn moreGrids and bulkheads taken down.
Learn morePartitions out before the floor.
Learn moreBagged, weighed and documented.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and the lease or building rules. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized