Temporary Works
Propping, needling, raking shores and facade retention for buildings being altered or partly removed. Designed by an engineer, installed to that design, and inspected while it is in place.
Design
Propping that has been put where it looked sensible is not shoring, it is decoration that gets in the way. Real temporary works start with a load: what is being held, how much it weighs, where it wants to go and what the ground or the floor beneath can take.
From that comes prop spacing, sole plates, needling positions and whether the support has to run through more than one storey. The design is signed, and it is checked while it is standing rather than only when it goes in, because props get knocked, adjusted and quietly moved by other trades.
We inspect on a schedule and record it. Where the support is holding a wall that is being opened, the beam is covered under load-bearing wall removal; where it is holding part of a building being removed, under structural demolition; steelwork under structural steel removal.
How It Runs
What is held, how much, and where it goes.
Engineer designs, drawing issued and signed.
Props, needles and plates as drawn.
Scheduled checks recorded until it comes out.
What It Bears On
The commonest failure in temporary works is not the prop, it is the thing underneath it. A prop taking several tonnes and standing on a suspended floor is transferring that load into a slab that was designed for furniture, and unless the load is spread or carried down to something solid it simply moves the problem one storey lower.
The same applies outside, where soft ground under a sole plate will let a raking shore settle and go slack overnight. So the design has to follow the load all the way to something that can genuinely take it, which sometimes means propping through several floors to the ground slab.
We work that path out and show it on the drawing. Ground and slab work is handled under concrete removal, foundations under foundation breaking, and the surrounding scope under selective demolition.
Related Work
Partial removal with the rest standing.
Learn moreBeams sized and bearings built.
Learn moreMembers released in sequence.
Learn moreBases broken out under support.
Learn moreSlabs and structures taken out.
Learn moreThe wider controlled-removal scope.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any drawings or engineer reports you hold. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized