Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Tested And Contained
Old paint tested, removed under controlled conditions and cleared. It matters most where children are present and where demolition or sanding would otherwise turn a stable coating into airborne dust.
Dust Is The Risk
Lead paint sitting undisturbed under later coats is generally not the hazard people imagine. What creates the risk is disturbing it: sanding, burning off, dry scraping or knocking a wall down all convert a stable film into fine dust and fume that settles across a building and is very difficult to remove afterwards.
That is why the method matters more than the material. Wet methods, chemical stripping, containment and vacuum extraction keep it controlled; a heat gun and a sander does the opposite. It is also why demolition of a painted structure needs the paint assessed first rather than treated as ordinary rubble.
Where it coincides with other hazards the whole scope runs under abatement, structures come down afterwards under structural demolition, and waste is consigned under disposal and recycling.
How It Runs
Samples taken and analysed, not guessed.
Sealed, sheeted and extraction set up.
Wet or chemical methods, no dry sanding.
Vacuumed, wiped, verified and documented.
Children
Lead exposure matters far more for small children than for the adults doing the work, because the effects on a developing nervous system happen at much lower doses and are not reversible. Small children also behave in exactly the way that maximises exposure: hands on floors and window sills, then hands in mouths.
So in an occupied family home the controls are not really about the workers, they are about what is left behind on horizontal surfaces after the work finishes. Thorough cleaning and verification matter as much as the removal itself, and it is worth arranging for young children to be elsewhere while the work runs even where that is inconvenient.
Interior finishes are handled under strip-out, other hazards under asbestos removal, and full removals under house demolition.
Related Work
Commonly found in the same buildings.
Learn moreDamp-related contamination.
Learn moreFinishes removed after clearance.
Learn morePainted walls taken out safely.
Learn moreWhere the whole building goes.
Learn moreWaste consigned and documented.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any survey you already hold. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized