Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Levels And Fill
Basements, footings and voids filled and compacted properly, and the surface graded to the levels and falls your design needs. Filled in layers rather than tipped in and hoped over.
In Layers
Backfill that has been tipped into a void and levelled off looks identical on day one to backfill that has been placed and compacted in layers. The difference shows up over the next two winters as settlement, and by then the slab or the drive on top of it has cracked and the cause is invisible.
Proper backfill goes in in layers of a depth the compaction plant can actually work through, each one compacted before the next, using material that is suitable rather than whatever was nearest. Where the fill is under something structural, the specification comes from the engineer and testing may be required.
We work to the layer depth and record it. Suitable material often comes from concrete crushing on the same site, voids are created under excavation, and the finished plot is handed over under site clearing.
How It Runs
Material, layer depth and compaction.
Each layer compacted before the next.
Graded to the design levels and falls.
Layers and levels recorded for the file.
Water
Grading is mostly about where water goes. A surface that falls the wrong way by a small amount will pond, and against a building that means water sitting at the base of a wall for years. It is also a neighbour issue, because ground regraded to shed water usually sheds it somewhere, and that somewhere should not be the plot next door.
Falls are set from the design where there is one and from common sense where there is not: away from buildings, toward a drainage point that exists, and at a gradient that will survive a little settlement. We set them, check them with a level rather than by eye, and tell you where the water is going.
Drainage runs and soakaways sit outside our scope and we will say so rather than imply otherwise. Surfaces above are removed under driveway removal, the void beneath is formed under excavation, and the wider works sit under site work.
Related Work
The dig that creates the void.
Learn moreOn-site material for the fill.
Learn morePlot cleared before grading.
Learn moreOld surfaces off before levels.
Learn moreFootings out, then backfilled.
Learn moreSurplus material taken away.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and what needs to move. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized