Skip to main
24/7 emergency demolition across Hartford · Written quotes before any work starts
(613) 324-9141

Timber And Outbuildings

Hartford deck and shed removal, footings included

Decks, sheds, gazebos and pergolas taken apart, sorted and hauled. Concrete footings and deck blocks come out too where you want the ground clear, which most quotes quietly leave in.

  • Licensed and insured
  • Written quotes
  • Permit filed for you

What Gets Left Behind

Most quotes leave the footings in the ground

A deck comes off quickly. What tends to stay is the set of concrete piers or deck blocks underneath, and homeowners often discover them when they start landscaping months later. It is cheap to pull them while the machine is already on site and expensive to arrange a separate visit.

We ask the question up front and quote the ground clear rather than the deck gone, because those are different jobs and only one of them is what most people actually want. Larger pads run through slab removal, the material leaves under debris hauling with weigh tickets returned, and where the whole lot is being cleared it folds into the residential demolition scope at a better rate than a standalone visit.

Recent work
A mini excavator silhouetted against a cloud of dust on site
A rubble pile on a residential street with steel road plates laid across the ground

How It Runs

Four stages, priced before stage two

  1. Agree the finish

    Deck gone, or ground clear including footings.

  2. Disconnect

    Any lighting, power or gas lines made safe first.

  3. Dismantle and sort

    Timber, metal and composite separated for disposal.

  4. Pull and level

    Piers out, holes filled, ground raked level.

Not All Timber Is Waste

Deck removal: old cedar and hardwood is worth saving

Pressure-treated deck boards from the last twenty years are disposal, and there is no market for them. Older cedar, redwood and tropical hardwood are a different matter, and on a large deck the recovered material can be worth more than the labour to take it apart carefully.

We look at the timber during the site visit and tell you which you have. Where it is worth saving, careful dismantling runs under deconstruction and salvage rather than demolition, and you either keep the material or we credit it.

Where it is not, the fastest route is the cheapest and we say so. Everything that leaves is sorted under disposal and recycling so the diversion figure on your invoice is real, and the ground is finished under grading and backfill.

An excavator taking down a two-storey timber house, framing and boards in the bucket
On the quote Permit and inspection
Named separately Utility disconnect
Before the price Survey

Related Work

Related Hartford deck and shed removal services

All demolition services

Straight Answers

Hartford deck and shed removal questions, answered

Only if you ask, and you should. Pulling piers while the machine is on site costs very little, and arranging a separate visit later costs a great deal more.
Usually not for a deck or a small shed, but larger outbuildings on a foundation can need one. We check your municipality rather than guessing.
Old cedar and hardwood often can. Pressure-treated boards cannot, and anyone offering to reuse them is doing you no favours.
A standard rear deck is half a day to a day, plus footing removal. Multi-level decks with built-in seating take longer to dismantle than to knock down.
It is disconnected by a licensed trade before we start. Garden lighting and shed feeds are still live circuits and they are not our work to cut.

Customer reviews

What Hartford owners say about their demolition contractor

★★★★★ 4.9 · 127 reviews on Google
Read all reviews →
★★★★★

They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.

H. Vandermeer
House demolition, Hartford
★★★★★

Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.

P. Osei-Bonsu
Pool removal, West Hartford
★★★★★

The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.

M. Kowalczyk
Interior strip-out, East Hartford
★★★★★

Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.

R. Chaudhary
Garage demolition, Hartford

From The Blog

Hartford demolition guides

All Demolition Guides
A concrete building part demolished behind safety fencing, one facade still standing Cost & Quotes

August 31, 2026 7 min read

What a Hartford demolition quote should include

Two quotes for the same building can differ by thousands, and it is almost never the same job priced differently. Here is what each line should say.

Read article

Next Step

Get a deck and shed removal quote in Hartford

Send the address and a few photos. We will tell you what survey and permit the job needs before we price it.

Licensed and insured · Permit and inspection included · Written quotes, itemized