Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Strip-Out Work
Walls, ceilings, floors and services taken out so the next fit-out starts from a known condition. Dust is contained, the structure is left intact, and what stays is protected rather than repaired later.
What Gets Protected
Most interior jobs go wrong in the things nobody scoped: the lift lobby carpet, the sprinkler heads, the neighbouring tenant complaining about dust on a Tuesday. Protection is cheap when it is planned and expensive when it is a remedial claim.
We hoard to deck rather than to ceiling grid, run negative air so the pressure gradient works for you, and tack-mat every exit. Sprinklers and detection are isolated formally through the building rather than taped over. Where the ceiling comes out, the ceiling and soffit work exposes services that were never on a drawing, so we allow for discovery instead of pretending the as-builts are right.
Anything structural moves to load bearing wall removal with shoring designed first, and pre-1990 buildings settle asbestos removal before a single wall opens.
How It Runs
Structure, services and finishes that must survive.
Hoarding to deck, negative air, alarm isolation, floor cover.
Finishes, partitions and services out in sequence.
Swept to slab and deck, ready for the fit-out trades.
The Work
Grouped by what the job actually is rather than by the part being fitted.
Whole floors back to structure, services capped.
Learn moreNon-structural partitions out cleanly.
Learn moreTile, screed, vinyl and adhesive lifted to slab.
Learn moreGrid, tile and bulkheads down, services exposed.
Learn moreCubicles, glazing and cabling stripped out.
Learn moreDomestic rooms back to stud and subfloor.
Learn moreStraight Answers
From The Blog
Written for the research stage.
Next Step
Send the address and a few photos. We will tell you what survey and permit the job needs before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized