Walls that are carrying weight taken out and replaced with a beam that has been sized for the load. Temporary support goes in first, the design is signed, and building control sees it.
The Beam
A beam replacing a load-bearing wall carries everything the wall was carrying, and the size of it is a calculation rather than an opinion. It depends on the span, what is above, whether a roof load lands on it, and what the bearing at each end can actually take.
Undersize it and the floor above deflects, doors stop closing and the crack appears six months later when everyone has been paid. We have the beam designed by an engineer, we build the padstones and bearings the design calls for, and you get the calculations to keep.
Building control usually wants to see the design and inspect the bearing before it is covered, and that inspection is part of the programme. Supports during the work are covered under shoring and support, non-structural walls come out under wall removal, and the wider works run as selective demolition.
How It Runs
What the wall carries, checked above and below.
Engineer sizes the beam and the bearings.
Support in, wall out, beam set on padstones.
Building control sees the bearing before covering.
Both Sides
The dangerous moment is not removing the wall, it is the interval between the wall stopping carrying and the beam starting to. Everything above has to be held during that gap, on both sides, and the props have to bear onto something that can take the load rather than onto a floor that will simply move.
Where the wall runs through more than one storey, the propping runs through them too, which is the part homeowners are most often surprised by. We set the propping to the engineer s design, check it before the first course comes out, and keep it in until the beam is bearing and the mortar has gained strength.
Where the same job includes taking out a chimney breast or a section of floor, that is priced under structural demolition, footings under foundation breaking, and rubble leaves under debris hauling.
Related Work
Propping designed and signed off.
Learn moreLarger partial removals.
Learn moreNon-structural partitions out.
Learn morePadstone bases and footings.
Learn moreThe room taken back first.
Learn moreRubble removed and weighed.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any drawings or engineer reports you hold. We will tell you what the scope really is before we price it.