Outbuildings, slabs, hardstanding, fencing and vegetation taken off a plot so a builder can start. What the municipality protects and what needs consent is checked before the machine arrives, not after.
Trees
Clearing a lot and removing trees are not the same job, and contractors who fold the two together cause problems. Municipalities differ enormously on what can be felled, what needs a permit and what is protected outright, and the penalties for taking a protected tree are severe and personal to the owner rather than the contractor.
One of the larger US demolition firms is explicit that lot scrapes exclude tree removal and tells customers to call about trees because every city has different rules. We take the same position: the lot gets cleared, and anything with a trunk gets checked against the local rules and quoted separately once we know where it stands.
Root protection areas also constrain where machines can track, which affects the clearing itself. Structures come out under deck and shed removal, slabs under slab removal, and arisings leave under debris hauling.
How It Runs
What is there, what is protected, what stays.
Tree consents and municipal requirements.
Structures, hardstanding and green waste.
Lot level, accessible and free of debris.
Line Locates
Every plot has services under it and almost none of them are where a drawing says. Getting the underground lines marked before machines start is standard practice among established demolition contractors, and it is free compared with the cost of hitting a gas main or a fibre run.
It also takes time to arrange, which is why it belongs at the start of the programme rather than the morning work begins. We call in the locates, mark up what comes back and work to it, and where a service crosses the area being cleared we agree how it is protected or diverted before starting.
Anything needing to be dug rather than scraped is handled under excavation, levels are set under grading and backfill, and the wider scope sits under site work.
Related Work
Digging out below the cleared level.
Learn moreLevels set and compacted.
Learn moreArisings weighed and removed.
Learn moreOld bases and hardstanding.
Learn moreOutbuildings and structures.
Learn moreWhere a building is going too.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and what needs to move. We will tell you what the scope really is before we price it.