Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Sheds And Units
Portal frames, cladding, roof sheets, mezzanines and the slab beneath. Steel is weighed off and credited against the price rather than quietly kept, and the survey is settled before anything is cut.
Scrap Value
A portal-framed warehouse is mostly recoverable steel, and its scrap value is large enough to change the number at the bottom of a quote. Some contractors price the demolition and keep the steel; others weigh it off and credit it back.
Both are legal and only one is transparent, so ask which you are being given before you compare two prices that look similar. We weigh at a licensed yard, hand over the tickets, and set the credit against the invoice as its own line.
Cladding is separated for recycling under disposal and recycling, the frame comes down under structural demolition, and the floor slab lifts under slab removal.
How It Runs
Asbestos survey, services isolated, notification filed.
Roof sheets and cladding down, separated for recycling.
Portal frame cut down in a planned sequence.
Slab out, ground levelled, steel tickets handed over.
Before The Machine
Commercial demolition carries a notification period to the regulator, and it runs in calendar days whether or not you have started. It sits alongside the asbestos survey, which on a building of this age will usually find something in the roof sheet, the flashing or the gasket rather than nowhere at all.
Both of these are known before a quote is written, so a programme that has the machine arriving next week is a programme that has not filed anything. We file the notification the day the job is engaged and book the survey in the same week, because those two clocks run in parallel and neither of them run faster for being ignored.
Anything the survey finds is handled under asbestos removal before industrial demolition begins, and the debris leaves under debris hauling.
Related Work
Frames and mezzanines cut and recovered.
Learn moreEquipment isolated, drained and removed.
Learn moreFloor slabs broken out and crushed.
Learn moreRoof sheets and flashing cleared first.
Learn moreYard and hardstanding cleared after.
Learn moreWeighed out with a recycling breakdown.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any drawings or survey you already hold. We will tell you what the scope really is before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized