Cuts And Penetrations
Openings, penetrations and controlled cuts through slabs, walls and structures. Every position is scanned before drilling, because reinforcement, tendons and live services are rarely where the drawings put them.
Scan First
A core through a slab takes minutes. A core through a tendon, a main reinforcing bar or a live cable takes weeks and an engineer. Scanning with ground penetrating radar before drilling is not a precaution, it is the method, and any contractor who quotes coring without it is pricing a gamble.
Reinforcement drawings are frequently out of date, services get added long after handover, and post-tensioned slabs are not always flagged to whoever is holding the drill. We scan, mark, and where a position clashes with something structural we move it and tell you why rather than drilling and hoping.
Larger openings that remove structure are handled under structural demolition with support under shoring and support, and whole slabs under slab removal.
How It Runs
Radar survey, positions marked and agreed.
Water management and access made safe.
Diamond cutting, clean edges, low vibration.
Cores removed, edges left ready for trades.
Water And Slurry
Wet diamond cutting keeps the blade cool and keeps silica dust out of the air, and it produces a grey slurry that has to go somewhere. In an occupied building that somewhere is not the floor below, the lift shaft or the nearest drain, and slurry finding its way into a tenant s ceiling is a common and entirely avoidable complaint.
It is also a pollution issue outdoors, because concrete slurry is strongly alkaline and should not reach a watercourse or a surface drain. We contain and vacuum at the tool and dispose of the slurry properly. Where a dry method with extraction is the better answer for the setting, we say so.
Waste is documented under disposal and recycling, adjoining works run under wall removal, and the scope sits inside concrete removal.
Related Work
When the whole slab is going.
Learn moreOpenings that remove structure.
Learn moreSupport around large openings.
Learn moreOpenings formed in partitions.
Learn moreMass concrete and footings.
Learn moreCores and slurry handled properly.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and rough dimensions. We will tell you what the scope really is before we price it.