Taken Apart
Buildings dismantled in reverse order so materials come out whole. Brick, timber, slate, fittings and architectural features recovered for reuse or resale rather than crushed into fill.
Slower, Not Worse
Taking a building apart by hand costs more in labour and takes longer than knocking it down, and it returns material with real value: reclaimed brick, structural timber, slate, flagstones, doors, ironmongery and architectural features. Whether it is worth doing is arithmetic rather than sentiment.
It depends on what the building is made of, how much of it survives removal intact, and whether there is a market nearby for what comes out. Nabors, one of the larger contractors, is blunt about the same point: they salvage appliances, fixtures, hardware, flooring, doors and brick when there is a market for it.
We survey, tell you what is realistically recoverable and what it is worth, and let you decide before the programme is set. Structural members are recovered under structural steel removal, the rest is separated under disposal and recycling, and the works sit inside selective demolition.
How It Runs
What is recoverable and what it is worth.
Fittings, features and finishes out whole.
Roof, then frame, then walls, by hand.
Material stacked, weighed and documented.
Diversion Rates
Beyond resale, deconstruction produces the documented recovery rates that planning conditions and green building certification increasingly ask for. A crushed building diverts a high tonnage as fill and very little as reuse; a dismantled one produces a materials record that shows what actually went back into use, which is a different and stronger claim.
Larger contractors report this formally, and it is worth agreeing at the outset what evidence you need, because gathering it afterwards from a pile of rubble is not possible. We record what leaves as reuse, as recycling and as waste, and hand over the tickets.
Hazardous material is cleared first under asbestos removal, because nothing containing it can be reused. Remaining structure is removed under structural demolition and the ground made good under site clearing.
Related Work
What is not worth dismantling.
Learn moreMembers recovered whole.
Learn moreSegregated with a materials record.
Learn moreCleared before anything is reused.
Learn moreFittings and features out first.
Learn moreGround made good afterwards.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any drawings or engineer reports you hold. We will tell you what the scope really is before we price it.