Residential
Interior
Commercial
Industrial
Site Work
Costs and Permits
Service Areas
Company
Guides and Legal
Lot Preparation
Clearing, digging, grading, backfill and haulage. The lot is handed back at a level written into the contract with compaction recorded, so your builder starts from a known condition rather than an argument.
Agree The Level
Almost every argument between a demolition contractor and a builder is about what "cleared" meant. To slab? To grade? To a stated elevation with a compaction result? Those are three different prices and three different lots, and the time to settle it is before the machines arrive.
We write the finish level into the quote, record compaction where it matters, and hand over a lot the next trade can build on without redoing our work. Imported fill is stated as its own line, because bringing material in is a real cost that vanishes from vague quotes.
Where structures come out first, that runs as house demolition or warehouse demolition and the site work follows, and where old slabs are in the way slab removal comes before the grading.
How It Runs
Utilities marked before anything breaks ground.
Finish grade written into the quote, not assumed.
Vegetation, structures and spoil removed and hauled.
Backfill placed in lifts, compaction recorded.
The Work
Grouped by what the job actually is rather than by the part being fitted.
Basements, footings and service trenches dug.
Learn moreVegetation, slabs and structures off the lot.
Learn moreFilled in lifts and compacted to a stated level.
Learn moreLoaded, weighed and tipped with tickets returned.
Learn moreMaterial sorted so diversion rates are real.
Learn moreOld walls and footings out before the dig.
Learn moreStraight Answers
From The Blog
Written for the research stage.
Next Step
Send the address and a few photos. We will tell you what survey and permit the job needs before we price it.
Licensed and insured · Permit and inspection included · Written quotes, itemized