Survey And Clearance
Survey, licensed removal, air clearance and documentation. It comes first in the programme because nothing else can safely start until it is finished, and because it is what most often changes a demolition price.
Cost Impact
This is the single largest variable in a demolition quote. Published cost data puts ordinary house demolition at roughly five to ten dollars a square foot; where there is significant asbestos in siding, roofing, flooring or insulation the same building runs two to three times higher, in the region of ten to thirty.
That gap is why a survey belongs before the price rather than after it, and why a quote given without one is a number that can move enormously. It is also why cheap quotes sometimes stay cheap by not looking. We survey first, price from what the survey found, and if it finds nothing the demolition is priced as ordinary work.
Clearance runs before house demolition or commercial demolition, and waste is documented under disposal and recycling.
How It Runs
Licensed survey, samples analysed.
Notification filed, method agreed.
Enclosure, extraction, licensed crew.
Air clearance, certificates handed over.
Where It Is
People look for corrugated sheeting and stop there. In buildings put up before the mid nineties it turns up in floor tile and the black adhesive beneath it, in textured coatings on ceilings, in insulating board behind soffits and around service risers, in gaskets, in cement flue pipes and in the rope seal round an old boiler door.
None of that is identifiable by eye, which is the whole reason for sampling rather than judging. The corollary is more useful than it sounds: a survey frequently comes back with far less than feared, and clearing three small locations is a very different job from stripping a building.
Floor finishes are lifted under floor removal, ceilings under ceiling and soffit, and remaining hazards under abatement.
Related Work
The other pre-nineties hazard.
Learn moreDamp-related contamination.
Learn moreOnce clearance is issued.
Learn moreTile and black adhesive.
Learn morePanels, coatings and boards.
Learn moreConsigned and documented apart.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.
Next Step
Send the address and any survey you already hold. We will tell you what the scope really is before we price it.