Crushed And Reused
Broken slabs, footings and hardstanding processed on site into graded granular fill. Reinforcement is separated for recycling and the product goes back into the ground rather than onto a lorry.
The Arithmetic
Crushing on site removes two costs at once: the weight going out as waste and the stone coming in as fill. On a large slab or a full lot scrape that is a substantial saving, and the crushed product is a perfectly good sub-base for what follows.
On a small job it is not, because mobilising a crusher has a fixed cost that a couple of lorry loads will never recover. There also has to be somewhere to sit it, somewhere to stockpile, and neighbours who can live with a noisy few days.
We do the arithmetic at survey and tell you which side of the line your job falls, including when the answer is that it is not worth it. Material comes from slab removal and foundation breaking, and the product goes back in under grading and backfill.
How It Runs
Does the tonnage justify mobilising a crusher.
Crusher sited, stockpile areas agreed.
Reinforcement pulled out for recycling.
Product graded and placed as fill.
Noise And Dust
Crushing is the loudest thing that will happen on most sites and it produces dust that carries further than the boundary if it is not managed. Water suppression at the crusher, sensible siting away from the nearest windows and working within agreed hours are what keep it acceptable, and telling the neighbours before it starts rather than after is worth more than any of them.
On urban sites the practical window is often narrower than the crushing itself needs, which is part of the arithmetic and a reason it sometimes loses to simply hauling the material out. We say which we think applies to your site and why.
Anything that does leave is weighed under disposal and recycling, transport under debris hauling, and the wider scope under site work.
Related Work
The material the crusher processes.
Learn moreFootings broken out and crushed.
Learn moreOld drives crushed for reuse.
Learn moreCrushed product placed and compacted.
Learn moreWhat cannot be reused on site.
Learn moreHaulage where crushing is not viable.
Learn moreStraight Answers
They told me on day one that the gas cap would take six weeks, not the demolition. That was the whole schedule and they were right.
Quoted a full removal rather than a partial fill, and explained why the cheaper option would show up on a survey later.
The asbestos survey came back positive on the floor tile. They stopped, abated it, gave me the paperwork, then carried on.
Lot was swept and the debris weighed out with a recycling breakdown. Neighbours never complained once about dust.